首页> 外文期刊>Tunnelling and underground space technology >Soil disturbance of Shanghai silty clay during EPB tunnelling
【24h】

Soil disturbance of Shanghai silty clay during EPB tunnelling

机译:EPB隧道施工中上海粉质黏土的土壤扰动

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The disturbance of Shanghai silty, clay during earth pressure balance (EPB) tunnelling has been studied through field monitoring, field measurement and laboratory test. The soil disturbance during tunnelling consists of two parts: stress disturbance, which is the change of effective stress; and strain disturbance, which is caused by the soil movement. The definition of stress disturbance degree of Shanghai silty clay is given by the change in the in situ effective stress before and just after tunnelling at the same site. According to the changes in the static cone penetrometer resistance, the extent of stress disturbance in a transverse section is determined. The relationships between the mechanical properties and stress disturbance degree are also studied.
机译:通过现场监测,现场测量和实验室测试研究了上海粉质黏土在土压平衡(EPB)隧穿过程中的扰动。掘进过程中的土壤扰动包括两部分:应力扰动,即有效应力的变化;应力扰动。以及土壤运动引起的应变扰动。上海粉质黏土应力扰动度的定义是通过在同一位置开挖前后现场有效应力的变化给出的。根据静锥锥度计电阻的变化,确定横截面上的应力扰动程度。还研究了力学性能与应力扰动程度之间的关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号