首页> 外文期刊>Tunnel >Between Aspiration and Reality - Building Management Automation in the Lötschberg Base Tunnel
【24h】

Between Aspiration and Reality - Building Management Automation in the Lötschberg Base Tunnel

机译:在理想与现实之间-勒施贝格地下隧道的楼宇管理自动化

获取原文
获取原文并翻译 | 示例
           

摘要

There is frequently an enor-mous gap between the original plans and reality particularly in conjunction with major pro-jects - the Berlin Brandenburg Airport or the Elbe Philharmonic Hall serve as examples. Cost and time pressure lead to a botched Situation and patch-work - with the Operator called on to cough up. The example of the Lötschberg Base Tunnel in Switzerland reveals the Problems Operators have to contend with and how these can be partly resolved thanks to modern building manage-ment Solutions.
机译:原始计划与现实之间常常存在巨大差距,尤其是与主要项目结合时,柏林勃兰登堡机场或易北爱乐音乐厅就是其中的一个例子。成本和时间压力导致情况和修补工作陷入瘫痪-操作员被要求咳嗽。瑞士Lötschberg基地隧道的示例揭示了运营商必须解决的问题,以及借助现代建筑管理解决方案可以部分解决这些问题。

著录项

  • 来源
    《Tunnel》 |2013年第4期|1012-15|共5页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号