首页> 外文期刊>Tunnel >Steinbuehl Tunnel Breakthrough six Months earlier than planned
【24h】

Steinbuehl Tunnel Breakthrough six Months earlier than planned

机译:Steinbuehl隧道比计划提前六个月突破

获取原文
获取原文并翻译 | 示例
           

摘要

The breakthrough of the Steinbuehl Tunnel was celebrated at the Todsburg portal on 6 November 2015, six months earlier than scheduled. At the event in Hohenstadt, Georg Brunnhuber, chairman of the Stuttgart-Ulm rail project association, greeted guests including the minister for finance and industry of the state of Baden-Wuerttemberg, Nils Schmid;the parliamentary secretary for transport, Norbert Bar-thle; the chairman of DB Projekt Stuttgart-Ulm GmbH, Manfred Leger; the managing director (COO) of Porr AG, Hans Wenkenbach and the mayor of Hohenstadt, Guenter Riebort.
机译:Steinbuehl隧道的突破于2015年11月6日在Todsburg门户举行,比原定计划提前了六个月。在Hohenstadt举行的活动中,斯图加特-乌尔姆铁路项目协会主席Georg Brunnhuber向来宾致敬,包括巴登-符腾堡州财政和工业部长尼尔斯·施密德(Nils Schmid);议会交通秘书诺伯特·巴特勒(Norbert Bar-thle); DB Projekt斯图加特-乌尔姆有限公司董事长Manfred Leger; Porr AG的总经理(Hans Wenkenbach)和Hohenstadt市长Guenter Riebort。

著录项

  • 来源
    《Tunnel》 |2015年第7期|2-3|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号