...
首页> 外文期刊>Tunnel >Universal Test Rig at the Central Construction Lab, Muenster University of Applied Sciences
【24h】

Universal Test Rig at the Central Construction Lab, Muenster University of Applied Sciences

机译:曼斯特应用科技大学中央建设实验室的通用试验台

获取原文
获取原文并翻译 | 示例

摘要

200 kilonewtons press down on a 20 cm wide, 30 cm high and 3.60 m long reinforced concrete beam. There is creaking and cracking, pieces splinter off, the first cracks can be observed. If there were not four steel bars integrated for strengthening, as reinforcement, the beam would break apart. Tests like this have been performed regularly in the central construction laboratory Bautechnische Zentrallabor (BZL) of the FH Muenster University of Applied Sciences since autumn 2014. On the occasion of the official opening ceremony in May, the laboratory invited company representatives, members of the faculty of civil engineering and other interested parties to the Fachhochschulzentrum for a demonstration.
机译:200千牛顿向下压在20厘米宽,30厘米高,3.60 m长的钢筋混凝土梁上。有嘎吱作响的裂纹,碎片裂开,可以观察到第一个裂纹。如果没有集成用于加固的四根钢筋,则梁会破裂。自2014年秋季以来,此类测试已在曼彻斯特应用技术大学的中央建筑实验室Bautechnische Zentrallabor(BZL)中定期进行。在5月的正式开幕典礼上,实验室邀请了公司代表,教职员工Fachhochschulzentrum的土木工程和其他有关方面进行了示范。

著录项

  • 来源
    《Tunnel 》 |2015年第5期| 4-4| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号