首页> 外文期刊>Tunnel >Six Years after Construction Start -Foundation Stone laid for Stuttgart 21 Underground Station
【24h】

Six Years after Construction Start -Foundation Stone laid for Stuttgart 21 Underground Station

机译:开工六年后-斯图加特21地铁站奠基

获取原文
获取原文并翻译 | 示例
           

摘要

Classical music sounded from the loudspeakers down into the site, but could not drown out the chorus and whistling of the demonstrators in the background: scraps of speech and insults were still audible. "Bunch of liars" shouted the demonstrators and "stay up here". It was a bit like it always is on the megaproject Stuttgart 21: Official occasions sometimes become political issues. The occasion on 16 September 2016 was the laying of the foundation stone of the new underground station - the core of Stuttgart 21.
机译:古典音乐从扬声器传到现场,但在后台并没有淹没示威者的合唱和吹口哨:仍然可以听到说话的声音和侮辱。示威者大喊“撒谎”,“待在这里”。大型项目斯图加特21总是像这样:官方场合有时会成为政治问题。 2016年9月16日是斯图加特21地铁站新地下站的奠基石。

著录项

  • 来源
    《Tunnel》 |2016年第6期|10-14|共5页
  • 作者

    Ruediger Sinn;

  • 作者单位

    Deggenhausertal, Deutschland/Germany;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号