...
首页> 外文期刊>Tunnel >Compressed Air Work: Experience with the use of German TBG O_2 Decompression Tables
【24h】

Compressed Air Work: Experience with the use of German TBG O_2 Decompression Tables

机译:压缩空气工作:使用德国TBG O_2减压表的经验

获取原文
获取原文并翻译 | 示例

摘要

Compressed air work - initially used in caissons for bridge foundations or tunnels completely excavated under compressed air conditions -has also become standard in TBM tunnelling in the last decades. As air only decompression had caused several cases of decompression illness (DCI) in the past, work in compressed air and the decompression procedures had to be reassessed. As a result oxygen decompression was implemented into the decompression procedure.
机译:压缩空气工作-最初用于沉箱中在压缩空气条件下完全开挖的桥梁基础或隧道中-在最近几十年中也已成为TBM隧道的标准。由于过去仅空气减压曾导致数例减压病(DCI),因此必须重新评估压缩空气工作和减压程序。结果,将氧气减压实施到减压程序中。

著录项

  • 来源
    《Tunnel》 |2016年第1期|20-3032-34|共14页
  • 作者单位

    Oberbauleiter/General Site, Hochtief Infrastructure GmbH, Essen, Deutschland/Germany;

    Hyperbaric Medical Consulting, Wessling, Deutschland/Germany;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号