...
首页> 外文期刊>Tunnel >Design and Construction of Tunnels in Jointed Rock According to the AJRM Method - Part 2
【24h】

Design and Construction of Tunnels in Jointed Rock According to the AJRM Method - Part 2

机译:根据AJRM方法的关节岩隧道的设计与施工。第2部分

获取原文
获取原文并翻译 | 示例

摘要

The first part of this article was published in the 3/2021 issue of tunnel [15]. There, the authors present the AJRM method. The rock mechanical model is explained. With the aid of case studies, the advantages of a realistic simulation of the behavior of jointed rock as well as of the interaction of rock mass and structure are illustrated. As announced, part 2 of the article deals with the rock hydraulic model and related case studies as well as with the determination of the required parameters. Thus, an overall method for a safe and economic design of structures as well as for groundwater modeling in jointed rock is available.
机译:本文的第一部分发表于3/2021隧道问题[15]。 在那里,作者呈现了AJRM方法。 解释了岩石机械模型。 借助于案例研究,示出了易于仿真的连接岩体的行为以及岩体质量和结构的相互作用的优点。 据宣布,文章第2部分涉及岩石液压模型及相关案例研究以及确定所需参数的确定。 因此,可以提供一种用于安全性和经济的结构的整体方法以及连接岩石中的地下水建模。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号