...
首页> 外文期刊>Tunnel >Design and Construction of Tunnels in Jointed Rock according to the AJRM Method - Part 1
【24h】

Design and Construction of Tunnels in Jointed Rock according to the AJRM Method - Part 1

机译:根据AJRM方法的关节岩隧道的设计与施工。第1部分

获取原文
获取原文并翻译 | 示例

摘要

For a safe and economical design of structures in jointed rock, a realistic consideration of the interaction between rock mass and structure is required. This requirement is neither fulfilled by the subgrade reaction method nor by classification systems (Q, RMR, RMi). Also the procedure on the basis of the GSI and the Hoek-Brown failure criterion, introduced by Hoek-Brown, in many cases is not adequate, since it assumes isotropic rock mass behavior. The AJRM-Method however, which is explained in the given article by means of examples, allows for a realistic description of the jointed rock mass behavior under consideration of the frequently prevailing anisotropy, and thus enables for a safe and economic design. The AJRM-Method can also be applied to groundwater modelling. This as well as the determination of the required parameters will be outlined in the second part of the given article.
机译:为了安全和经济地设计连接岩石中的结构,需要对岩体和结构之间的相互作用的实际考虑。 该要求既不是由路基反应方法也不满足的,也不是由分类系统(Q,RMR,RMI)满足。 此外,由Hoek-Brown引入的GSI和Hoek-Brown失效标准的程序也没有足够的方法,因为它承担了各向同性的岩石群众行为。 然而,通过实施例在给定的制品中解释的AJRM方法允许考虑经常普遍的各向异性的连接岩体行为的现实描述,从而实现安全和经济的设计。 AJRM方法也可以应用于地下水建模。 这以及所需参数的确定将在给定物品的第二部分中概述所需参数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号