And once again the Stuttgart 21 project: Driving for the Feuerbach Tunnel, which connects the existing railway lines to and from Mannheim, Karlsruhe and Paris with the future Stuttgart Central Station, was completed with a tunnel breakthrough on June 5, 2020 after a construction period of around five and a half years. The breakthrough took place at a depth of around 15 m shortly before Feuerbach station. A joint venture consisting of the companies Ba-resel GmbH, Alfred Kunz and Walo Bertschinger AG from Switzerland had been commissioned with the construction of the tunnel in 2012; driving for the Feuerbach tunnel started on 10 December 2014 from the intermediate heading Prag. From this access tunnel, the two single-track bores were driven in the direction of both the main railway station and Feuerbach using the conventional excavation method. From the opposite direction from Feuer-bach station, the double-track section of the tunnel was built in parallel. For this purpose, the existing tracks at Feuerbach station had to be moved four times during ongoing operations.
机译:斯图加特21项目又一次:为Feuerbach隧道驾驶,该隧道将现有的铁路线与Mannheim,Karlsruhe和巴黎连接到未来的斯图加尔中央车站,在施工期间在2020年6月5日之前完成了隧道突破大约五年半。 Feuerbach站前不久的突破在大约15米的深度约为15米。由瑞士的公司Ba-Resel GmbH组成的合资企业组成,从瑞士委托瑞士委托了2012年隧道的建设; Feuerbach隧道驾驶于2014年12月10日从中级标题出发。从该接入隧道,使用传统的挖掘方法,在主火车站和Feuerbach的方向上驱动两个单轨孔。从Feuer-Bach站的相反方向,隧道的双轨部分并联内置。为此目的,在持续运营期间,Feuerbach站的现有曲目必须移动四次。

著录项

  • 来源
    《Tunnel》 |2020年第3期|12-12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号