...
首页> 外文期刊>Tunnel >Karawanken Tunnel: ASFINAG Starts Construction of the second Tube
【24h】

Karawanken Tunnel: ASFINAG Starts Construction of the second Tube

机译:卡拉旺肯隧道:ASFINAG开始第二条管道的建设

获取原文
获取原文并翻译 | 示例
           

摘要

On September 18, 2018, ASFINAG (Austrian Motorway Authority) heralded in the complete further development of the KarawankenTunnel with the ground-breaking ceremony on the A 11 Karawanken motorway. Thanks to this new structure cofi-nanced by the EU, the two-way section on the important north-south link between Austria and Slovenia will soon be a thing of the past. This will provide more traffic safety quite apart from bringing a significant relief for the route, which is particularly busy in summer. Outside the holiday season, some 10 000 vehicles use the A 11 Karawanken motorway on a daily basis; in the summer months, however, the figure swells to more than 30 000 vehicles per day. Congestion is inevitable on account of the restricted capacity provided by a single tunnel tube.
机译:2018年9月18日,奥地利高速公路管理局(ASFINAG)通过A 11卡拉旺肯高速公路的动工仪式预示着卡拉旺肯隧道的全面进一步发展。得益于欧盟资助的这种新结构,关于奥地利与斯洛文尼亚之间重要的南北连接的双向路线将很快成为过去。这不仅可以大大减轻该路线的交通安全性,而且在夏季特别繁忙。在假日季节以外,每天大约有10,000辆汽车使用A 11 Karawanken高速公路;然而,在夏季,这一数字每天激增至3万多辆。由于单个隧道管所提供的容量有限,因此不可避免地会发生拥塞。

著录项

  • 来源
    《Tunnel》 |2018年第5期|25|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号