首页> 外文期刊>Trenchless Technology >WWTP Outfall Extension
【24h】

WWTP Outfall Extension

机译:污水处理厂排污口扩展

获取原文
获取原文并翻译 | 示例
           

摘要

Mears Group Inc. took on a short but complicated HDD project in Gig Harbor,Wash.,installing 711 ft of 24-in. HDPE in a water-to water crossing under a historical lighthouse sitting on a sandspit and near a community park. Due to 15-ft tides and potential storm surges, Advanced American Construction built stationary platforms for the HDD rigs at both the entry and exit sites 45 to 50 ft above the sea bed.The commensurate hydrostatic head associated with this elevation created an additional 30 psi of required lift to get the anticipated heavy returning drilling fluids (with entrained cuttings) back up to the top of the platform to the recycling plant.
机译:Mears Group Inc.在华盛顿州的Gig Harbor进行了一个简短而复杂的HDD项目,安装了711英尺的24英寸长。 HDPE在一条水上水交叉路口下,在一座历史悠久的灯塔下,坐在沙坑上和社区公园附近。由于15英尺高的潮汐和潜在的风暴潮,Advanced American Construction在海床以上45至50 ft的进场和出场现场为HDD钻机建造了固定平台,与此高度相关的相应静水压头又增加了30 psi所需的提升量,以使预期的重磅钻井液(夹带碎屑)返回平台顶部到达回收站。

著录项

  • 来源
    《Trenchless Technology》 |2011年第11期|p.34|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号