首页> 外文期刊>Trenchless Technology >MORTIMER ON THE MOVE
【24h】

MORTIMER ON THE MOVE

机译:运动中的莫蒂默

获取原文
获取原文并翻译 | 示例
           

摘要

Hello, Mortimer here. Last summer I found myself in the sewers of Olathe, Kan., observing the installation of a 24-in. carrier pipe for a new sewer line. Boring contractor EJM Services really has its work cut out for them this time. Five bores in limestone, each a different length and depth, and still needing to maintain a .2 percent grade. The project started out with EJM using an auger machine, but because of the rocky ground conditions, they were unable to maintain a close enough grade to allow for the sewer line to pass inspection. EJM decided to try the Vermeer AXIS guided boring system.
机译:您好,莫蒂默在这里。去年夏天,我发现自己在堪萨斯州奥拉西(Olathe)的下水道中,观察24英寸的安装情况。新的下水道管线的输送管。无聊的承包商EJM Services这次确实为他们完成了工作。石灰岩中有五个钻孔,每个钻孔的长度和深度都不同,但仍需要保持0.2%的坡度。该项目以使用螺旋钻机的EJM开始,但是由于地面崎conditions不平,他们无法保持足够接近的坡度以允许下水道管线通过检查。 EJM决定尝试威猛(Vermeer)AXIS导向镗孔系统。

著录项

  • 来源
    《Trenchless Technology》 |2013年第3期|12-12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号