首页> 外文期刊>TRANSPORTATION SCIENCE >Vehicle Routing for Urban Snow Plowing Operations
【24h】

Vehicle Routing for Urban Snow Plowing Operations

机译:城市除雪作业的车辆路线

获取原文
获取原文并翻译 | 示例
       

摘要

Winter road maintenance planning involves a variety of decisions related to the routing of vehicles for spreading chemicals and abrasives, plowing roadways and sidewalks, loading snow into trucks, and transporting snow to disposal sites. In this paper, we present a model and two heuristic solution approaches based on mathematical optimization for the routing of vehicles for snow plowing operations in urban areas. Given a district and a single depot where a number of plows are based, the problem is to determine a set of routes, each performed by a single vehicle that starts and ends at the district's depot, such that all road segments are serviced while satisfying a set of operational constraints and minimizing a time objective. The formulation models general precedence relation constraints with no assumption on class connectivity, different service and deadhead speed possibilities, separate pass requirements for multilane road segments, class upgrading possibilities, and vehicle road segment dependencies. Several extensions, such as turn restrictions, load balancing constraints, and tandem service requirements, which are required in a real-life application, are also discussed. Two objectives are considered: A hierarchical objective and a makespan objective. The resulting model is based on a multicommodity network flow structure to impose the connectivity of the route performed by each vehicle. The two solution strategies were tested on data from the City of Dieppe, New Brunswick, Canada.
机译:冬季道路维护计划涉及与车辆路线有关的各种决策,这些车辆用于传播化学药品和磨料,在道路和人行道上耕作,将雪装载到卡车中以及将雪运送到处置场所。在本文中,我们提出了一种基于数学优化的模型和两种启发式求解方法,用于在城市地区进行扫雪作业的车辆路线。给定一个区域和一个基于多个犁的单一仓库,问题在于确定一组路线,每条路线均由在该区域的仓库处起点和终点的单个车辆执行,以便在满足道路交通要求的同时对所有路段进行维修一系列操作约束,并最大程度地减少了时间目标。公式化模型对一般优先关系约束进行建模,其中不考虑类别连通性,不同的服务和空载速度可能性,多车道路段的单独通行要求,类别升级的可能性以及车辆路段的依赖性。还讨论了实际应用中需要的几个扩展,例如转弯限制,负载平衡限制和串联服务要求。考虑了两个目标:分层目标和制造期目标。结果模型基于多商品网络流结构,以强加每个车辆执行的路线的连通性。根据来自加拿大新不伦瑞克省迪耶普市的数据对这两种解决方案策略进行了测试。

著录项

  • 来源
    《TRANSPORTATION SCIENCE》 |2008年第1期|p.44-56|共13页
  • 作者单位

    Department of Mathematics and Industrial Engineering and GERAD, École Polytechnique de Montréal, Montréal, Québec, Canada H3C 3A7Department of Mathematics and Industrial Engineering and GERAD, École Polytechnique de Montréal, Montréal, Québec, Canada H3C 3A7Department of Industrial Engineering and PYLO, Universidad de los Andes, Bogotá, Colombia;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    winter road maintenance; snow removal; arc routing; Chinese postman problem;

    机译:冬季道路维护;除雪;电弧布线;中国邮递员问题;
  • 入库时间 2022-08-17 23:39:24

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号