首页> 外文期刊>Traffic engineering & control >A major streetscape transformation will be ready for 2012 Olympics
【24h】

A major streetscape transformation will be ready for 2012 Olympics

机译:重大的街景改造将为2012年奥运会做好准备

获取原文
获取原文并翻译 | 示例
           

摘要

The £30m (€34.4m) development, which will transform the existing Exhibition Road area into one of the most important public spaces in London, has reached a key stage with project managers Schal - part of Carillion pic - appointing Balfour Beaty to undertake the preconstruction stage of the streetscape works and finalise the design. This stage is programmed tornlast six months to be followed by the physical paving works on site which are scheduled to finish in the autumn of 2011.rnThe project aims to improve the pedestrian experience and increase safety for all road users by transforming the heart of London's museum district into a single surface shared public space.
机译:这项耗资3,000万英镑(合3,440万欧元)的开发项目将把现有的展览路区域转变为伦敦最重要的公共场所之一,项目经理Schal(Carillion图片的一部分)任命Balfour Beaty来承办该项目,现已进入关键阶段。街景工程的预建设阶段并完成设计。此阶段计划进行到最后六个月,之后将在现场进行实物铺路工程,并计划于2011年秋季完成。该项目旨在通过改造伦敦博物馆的心脏地带,改善行人体验,并为所有道路使用者提高安全性小区变成一个表面共享的公共空间。

著录项

  • 来源
    《Traffic engineering & control》 |2009年第6期|251-251|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号