首页> 外文期刊>Traffic engineering & control >ACM at heart of first ma naged motorway
【24h】

ACM at heart of first ma naged motorway

机译:ACM是第一条管理高速公路的核心

获取原文
获取原文并翻译 | 示例
       

摘要

The purpose of this article is provide information about the "Birmingham Box Phase 1 and 2" Managed Motorway Project. The Client for the project was the Highways Agency, the Designer was Mouchel and the Contractor was Carillion Construction Ltd. with numerous supply chain partners supporting the delivery. This project heralded the introduction of managed motorways, which is effectively the updated brand for Active Traffic Management which was piloted on the M42 between Junctions 3a and 7 some five years ago.
机译:本文的目的是提供有关“伯明翰Box 1和2期”托管高速公路项目的信息。该项目的客户是公路局,设计师是Mouchel,承包商是Carillion Construction Ltd.,有众多供应链合作伙伴为交付提供支持。该项目预示了托管高速公路的引入,这实际上是主动交通管理的更新品牌,该品牌于大约五年前在3a和7交界处的M42上试行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号