首页> 外文期刊>Thermal engineering >Selecting the Optimal Operating Conditions of the Calorifer Installed Upstream of the Regenerative Air Heater Used in a 300-MW Power Unit
【24h】

Selecting the Optimal Operating Conditions of the Calorifer Installed Upstream of the Regenerative Air Heater Used in a 300-MW Power Unit

机译:选择安装在300兆瓦动力装置中的蓄热式空气加热器上游的量热器的最佳运行条件

获取原文
获取原文并翻译 | 示例
           

摘要

A procedure is developed using which it is possible to select the optimal operating conditions of the calorifer installed upstream of a regenerative air heater depending on the outdoor air temperature, number of power units that are in operation, and their power output, taking into account the requirements for the microclimate of production premises.
机译:制定了一种程序,利用该程序可以根据室外空气温度,正在运行的功率单元的数量及其功率输出,选择安装在回热式空气加热器上游的量热器的最佳运行条件。生产场所小气候的要求。

著录项

  • 来源
    《Thermal engineering》 |2010年第8期|p.689-692|共4页
  • 作者单位

    Ivanovo State Power Engineering University, ul. Rabfakovskaya 34, Ivanovo, 153003 Russia;

    rnIvanovo State Power Engineering University, ul. Rabfakovskaya 34, Ivanovo, 153003 Russia;

    rnIvanovo State Power Engineering University, ul. Rabfakovskaya 34, Ivanovo, 153003 Russia;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号