The consequences resulting from an emergency failure of one subflow in the middle radiant part of a modernized PK-39-IIM boiler occurred during one of its first startups after the erection are presented. A numerical analysis of the factors that caused this failure is carried out. The calculation was carried out in accordance with the recommendations suggested in the standard method of hydraulic design. It is shown that at a load equal to 40% of its nominal value, increment of heat absorption in the subflow equal to 586 kJ/kg (140 kcal/kg), and heat absorption nonuniformity coefficient in the misaligned element equal to 1.5, the temperature of medium downstream of the subflow is equal to 670℃ (operating conditions close to those under which the failure occurred).
机译:介绍了由于现代化PK-39-IIM锅炉中辐射部分中一个子流的紧急故障而导致的后果,该事故发生在安装之后的首次启动中。对导致此故障的因素进行了数值分析。根据水力设计的标准方法中建议的建议进行计算。结果表明,在等于其标称值40%的负载下,子流中的吸热增量等于586 kJ / kg(140 kcal / kg),而未对准元件的吸热不均匀系数等于1.5,则子流下游介质的温度等于670℃(操作条件接近发生故障的条件)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号