首页> 外文期刊>Thermal engineering >CACD (Complex Air Cleaning Devices) of the GTE (Gas Turbine Electrostation)-110: Problems and Solutions
【24h】

CACD (Complex Air Cleaning Devices) of the GTE (Gas Turbine Electrostation)-110: Problems and Solutions

机译:GTE(燃气轮机电站)-110的CACD(复杂的空气净化设备):问题与解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

The paper considers CACD of the compressor of the GTE-110 gas turbine. The CACD efficiency has been tested under different conditions of the GTE-325 of the Ivanovo combined cycle plant (CCP) JSC INTER RAO-Electrogeneration Exploitation. It sets out the requirements for the dust collector, de-icing system, and air intake tract CACD. De-icing and air preparation methods are shown.
机译:本文考虑了GTE-110燃气轮机压缩机的CACD。 CACD效率已在Ivanovo联合循环电厂(CCP)JSC INTER RAO-Electrogeneration Exploitation的GTE-325的不同条件下进行了测试。它规定了集尘器,除冰系统和进气道CACD的要求。显示了除冰和空气制备方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号