Improving Flexibility and Economic Efficiency of CCGT Units' Operation in the Conditions of the Wholesale Electricity Market

机译:电力批发市场条件下提高CCGT机组运行的灵活性和经济效益

获取原文
获取原文并翻译 | 示例
           

摘要

The issues of improving flexibility and operation modes of combined-cycle plants with three-pressure heat-recovery steam generators (CCGT with HRSG) are considered in the conditions of the wholesale electricity market. Operation modes of high-performance CCGT units, which were designed mainly for the basic operation mode with a minimum number of starts and load variations are significantly different from it due to the lack of regulatory capacities in power systems. The increasing CCGT unit fractional load running time, emerging role of ramping to the minimal possible load, and expediency of involving the CCGT unit to adjust the frequency and power in the power system make it necessary to extend their adjustment load range limits. The article analyzes the possibilities and the need for maximum CCGT ramping during the night-time valley from a technical and economic point of view. The factors limiting the CCGT load range are obtained computationally and experimentally. The ways to reduce the technological minimum CCGT load are considered by heating the compressor inlet air, bypassing part of the compressed air to its inlet, and enhancing its flow control using inlet guide vanes (IGV) as well as combining these methods. The influence of the electricity price in the day-ahead market on the optimal generating capacity load is analyzed. The optimization of the CCGT operating modes in the conditions of the wholesale electricity market is carried out with allowance for the developed load range extension methods.
机译:在批发电力市场的情况下,考虑了提高具有三压热回收蒸汽发生器(CCGT和HRSG)的联合循环电厂的灵活性和运行模式的问题。高性能CCGT机组的运行模式主要是为基本运行模式设计的,具有最少的启动次数和负载变化,这是由于电力系统缺乏监管能力而与之大不相同的。 CCGT单元的分数负载运行时间不断增加,逐渐增加到最小负载的作用以及CCGT单元在电力系统中调节频率和功率的权宜之计,因此有必要扩展其调节负载范围极限。本文从技术和经济角度分析了夜间山谷中最大CCGT斜坡的可能性和需求。限制CCGT负载范围的因素可以通过计算和实验获得。可以通过以下方法来考虑降低技术最低CCGT负荷的方法:加热压缩机进气,将部分压缩空气旁路到其进气口,并使用进气导叶(IGV)以及结合这些方法来增强其流量控制。分析了日前市场中的电价对最优发电量负荷的影响。考虑到已开发的负荷范围扩展方法,在批发电力市场中对CCGT运行模式进行了优化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号