MLM Consulting is working on a new footbridge to replace an existing out of date structure over the River Cardener at Callus, 80km north west of Barcelona. The construction of a footbridge in Callus, a small town 80 km northwest of Barcelona, is the first of a two-phase project, to replace an old bridge that was originally built in 1931, destroyed during the Spanish Civil War, and reconstructed again in 1943. The existing structure is too narrow for both vehicles and pedestrians, and its reinforced concrete structure didn't comply with the current standards.
展开▼