The Tameer Towers development is a five-building, 9.5Mft~2 complex that will be the focal point for the Shams Abu Dhabi master plan and a new icon for the Middle East. Developed by Tameer Holdings Investments, the centrepiece of the complex will be a dramatic 300m high commercial tower with one of the world's largest atriums. The project is due for completion in 2011 and is set to be one of the world's tallest precast concrete buildings.rnThis article concentrates on the lateral stability elements of the commercial tower. Originally designed as cast in situ concrete, the contractor favoured precast construction for the majority of the building owing to the fast-track construction programme. Enabling works started on site in October 2007 and the design was completed in June 2008.
展开▼
机译:Tameer Towers开发项目是一座由五座建筑物组成的9.5Mft〜2建筑群,将成为Shams Abu Dhabi总体规划的重点,也是中东的新标志。由Tameer Holdings Investments开发的综合大楼的核心将是一座引人注目的300m高商业塔楼,其中包括世界上最大的中庭之一。该项目计划于2011年完成,将成为世界上最高的预制混凝土建筑之一。承包商最初设计为现浇混凝土,但由于采用了快速施工方案,因此大多数建筑物都倾向于预制建筑。启用工作于2007年10月在现场开始,设计于2008年6月完成。
展开▼