首页> 外文期刊>Structural engineer >University 'front door' breaks the thermal cycle
【24h】

University 'front door' breaks the thermal cycle

机译:大学的“前门”打破了热循环

获取原文
获取原文并翻译 | 示例
       

摘要

Newcastle University is currently investing E200M in its buildings, infrastructure and public spaces, which by 2010 will result in a massive transformation to the look of the university. Part of this transformation is a new 8000m2 Student and Administration Services Building, situated on Barras Bridge, opposite the Civic Centre.rnThe flagship five-storey, glass-fronted building (pictured) creates a welcoming 'front door' to the university and consists of a visitor centre on the ground floor. It includes extensive facilities for careers, accommodation and student wellbeing services as well as the marketing and communications directorate and development and alumni relations office.
机译:纽卡斯尔大学目前正在为其建筑物,基础设施和公共场所投资E200M,到2010年,这将导致该大学的外观发生重大转变。此次改造的一部分是新建的8000平方米的学生和行政服务大楼,位于公民中心对面的巴拉斯桥(Barras Bridge).rn旗舰五层高的玻璃墙建筑(如图所示)为大学创造了一个温馨的``前门'',包括一楼的游客中心。它包括用于职业,住宿和学生福利服务的广泛设施,以及市场和传播总局,发展和校友关系办公室。

著录项

  • 来源
    《Structural engineer》 |2009年第13期|34-34|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:21:12

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号