首页> 外文期刊>Structural engineer >Wind power turbine building research
【24h】

Wind power turbine building research

机译:风力涡轮机建筑研究

获取原文
获取原文并翻译 | 示例
           

摘要

Parsons Brinckerhoff is supporting an innovative research programme to stimulate innovation and the development of new technology for the UK's burgeoning offshore wind industry.rnWith £3M of funding through the Northern Way Innovation Programme, the project will focus on some of the key challenges presented by the new round of large wind turbines to be installed in deep water offshore in Round 3 and other sites around the UK. Key areas include foundation technology, installation techniques and electrical connections.rnParsons Brinckerhoff is part of the 'FabFound' consortium, led by TWI Ltd, which will develop new 'monopile' foundation designs capable of massrnproduction and straightforward installation. This will be essential to meet the high demand anticipated for these deep water structures over the next 20 years.
机译:帕森斯·布林克霍夫(Parsons Brinckerhoff)正在支持一项创新研究计划,以刺激英国新兴的海上风电产业的创新和新技术的发展。通过“北方之路”创新计划(Northern Way Innovation Programme)获得了300万英镑的资助,该项目将重点解决英国能源部提出的一些关键挑战。新一轮的大型风力涡轮机将安装在英国第三回合以及其他地点的深水海上。关键领域包括基础技术,安装技术和电气连接。ParsonsBrinckerhoff是由TWI Ltd牵头的FabFound财团的一部分,该基金会将开发能够批量生产和直接安装的新型“单桩”基础设计。这对于满足未来20年对这些深水结构的高需求至关重要。

著录项

  • 来源
    《Structural engineer》 |2010年第4期|10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号