首页> 外文期刊>The Structural Engineer >Offsite precast frames provide for rapid rise
【24h】

Offsite precast frames provide for rapid rise

机译:异地预制框架可实现快速上升

获取原文
获取原文并翻译 | 示例
       

摘要

The Concast Precast Group has completed a composite precast and steel total frame solution for a three-storey Waitrose in the High Street, Sevenoaks, Kent in just 12 weeks. An existing Waitrose was completely demolished to make way for a new store with two new floors of lower level car parking. The main contractor, RG Carter Projects, chose precast for the car park in order to shorten the construction programme, reduce future maintenance costs and eliminate columns to facilitate customer parking.
机译:Concast预制集团仅用了12周的时间就为肯特郡Sevenoaks大街的三层高的Waitrose完成了复合预制和钢制整体框架解决方案。现有的Waitrose已完全拆除,为新的商店铺平了道路,新的商店有两层新的较低层的停车场。总承包商RG Carter Projects选择了停车场预制件,以缩短施工计划,减少未来的维护成本并取消立柱以方便客户停车。

著录项

  • 来源
    《The Structural Engineer》 |2011年第16期|p.34|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:20:28

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号