首页> 外文期刊>The Structural Engineer >CROSS Newsletter No. 28
【24h】

CROSS Newsletter No. 28

机译:交叉通讯第28号

获取原文
获取原文并翻译 | 示例

摘要

CROSS have published Newsletter No 28 detailing problems during construction where temporary works have been involved. The newsletter can be downloaded in full from: http:// www.structural-safety.org/ and includes details of the following incidents: ? Steel stud failure - This event ocurred during construction works on a new bridge associated with major road improvements. As a support rod was being tightened to take the load of a table unit, a welded stud which attached a forged beam bracket to a steel girder failed ? Falsework support to a bridge - a near miss - There was a near collapse of a birdcage scaffold falsework structure during an 800 cubic metre concrete pour on a motorway bridge.
机译:CROSS发布了第28号通讯,详细介绍了涉及临时工程的施工过程中的问题。可以从以下网址完整下载该新闻通讯:http://www.structural-safety.org/,其中包含以下事件的详细信息:钢钉故障-在与主要道路改善相关的新桥的建筑工程中发生此事件。当拉紧支撑杆以承受工作台的负荷时,将锻造的梁支架固定到钢梁上的焊接螺柱失效了?桥的脚手架支撑-差点没命-在高速公路桥梁上浇筑800立方米的混凝土时,鸟笼脚手架脚手架结构几乎倒塌。

著录项

  • 来源
    《The Structural Engineer》 |2012年第12期|11-11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号