A basement at the Royal Shakespeare Company's (RSC) theatre at Stratford upon Avon has been made watertight as part of a £113M transformation that has taken 31/2 years. The Grade II listed building is on the banks of the River Avon and has to contend with a high water table. Sika 1 Pre-bagged Waterproofing System from Sika was used to waterproof the basement storage area.
展开▼