首页> 外文期刊>The Structural Engineer >The London 2012 International Broadcast Centre
【24h】

The London 2012 International Broadcast Centre

机译:2012年伦敦国际广播中心

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents the technical complexities and the structural solutions in achieving the design of the International Broadcast Centre.rnSeveral key factors had to be considered at all times throughout the design:rn1. The building was publically funded therefore economic design had to be achieved.rn2. The deadline was fixed and any betterment to the project programme was of huge benefit, particularly with respect to the fit-out phase.rn3. The 'temporary' nature of the building and its legacy use.rn4. The building had to provide appropriate accommodation for the world's media.rn5. Buildability.rnAll these aspects were fundamental to producing a good design. Testament to this is a completed building, designed and built to an accelerated programme and to a budget much lower than originally envisaged (Figure 16). This, outcome could not have been achieved without the close collaboration of the entire project team. It was a truly challenging project with an Olympic outcome.
机译:本文介绍了实现国际广播中心设计的技术复杂性和结构解决方案。整个设计过程中,始终必须考虑几个关键因素:rn1。该建筑物是公共资助的,因此必须实现经济设计。截止日期是固定的,对项目程序的任何改进都将带来巨大的好处,特别是在装修阶段。建筑物的“临时”性质及其遗留用途。rn4。该建筑必须为全球媒体提供适当的住宿。可构建性。所有这些方面都是产生良好设计的基础。证明这一点的是一栋完整的建筑,该建筑是按照加速计划设计和建造的,预算远低于最初的设想(图16)。如果没有整个项目团队的紧密合作,就无法实现这一目标。这是一个真正具有挑战性的项目,取得了奥运会成果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号