【24h】

Reply

机译:回复

获取原文
获取原文并翻译 | 示例
           

摘要

Alan's points are very valid and I did indeed note, in an initial draft of my paper, that the demise of prestressing occurred at the same time as improvements in the fabrication and erection of steel plate girders. Benaim was famous for creating alternative designs for contractors and we prepared dozens of such schemes in the UK from 1982 onwards - the majority of which were against poorly-designed concrete schemes. We also prepared a significant number of steel-composite alternative designs though, as we were never purely promoting concrete, but always seeking to obtain the best solution for our particular contractor client at that particular site.
机译:艾伦的观点非常正确,我确实在我的论文初稿中指出,预应力的消亡与钢板梁的制造和安装的改进同时发生。贝纳姆(Benaim)以为承包商创造替代设计而闻名,从1982年开始,我们在英国准备了数十个这样的方案-其中大多数是针对设计欠佳的混凝土方案。但是,我们也准备了许多钢复合材料替代设计,因为我们从未单纯地推广混凝土,而是一直在为特定承包商的特定客户寻求最佳解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号