首页> 外文期刊>The Structural Engineer >Are you managing the transition to CDM 2015?
【24h】

Are you managing the transition to CDM 2015?

机译:您是否正在管理向CDM 2015的过渡?

获取原文
获取原文并翻译 | 示例
           

摘要

There is more work involved in organising projects. Clients are becoming more involved. Clearer processes are being developed with more direction for the design team. Clients have to know whether there are subcontractors involved, so they can determine if a principal designer is required. This is highlighting the lack of pre-construction information reaching some of these groups in particular. On the whole, informed project teams are stepping up. Designers, in particular, will have to be better trained in respect of H&S so they really do follow the hierarchy of risk control during the design process. At the heart of the regulations is the goal of making sure everyone thinks about safety during design, and before a spade is put into the ground, or a wall of unknown construction is demolished.
机译:组织项目涉及更多的工作。客户越来越参与其中。正在为设计团队开发更清晰的过程,并提供更多指导。客户必须知道是否有分包商,以便他们确定是否需要首席设计师。这特别说明了缺乏到达这些人群中某些人群的施工前信息。总体而言,知情的项目团队正在加紧努力。特别是设计师,必须在H&S方面接受更好的培训,因此他们在设计过程中确实遵循风险控制的层次结构。法规的核心目标是确保每个人在设计过程中,在铲子掉入地下或拆除一堵未知建筑的墙壁之前都要考虑安全性。

著录项

  • 来源
    《The Structural Engineer》 |2015年第12期|32-33|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号