首页> 外文期刊>The Structural Engineer >Temporary Works Toolkit
【24h】

Temporary Works Toolkit

机译:临时工程工具包

获取原文
获取原文并翻译 | 示例
       

摘要

A number of examples have been provided of how influential construction methodology and temporary works can be on permanent works design. While it is seldom their responsibility to develop a detailed methodology, or to design temporary works, it is essential for the permanent works engineer to have sufficient appreciation of such factors if they are to provide effective, holistic design leadership to a project, to maximise their contribution to project efficiency, site safety and sustainability, and to fulfil their statutory duties.
机译:已经提供了许多示例,说明有影响力的施工方法和临时工程如何影响永久性工程设计。尽管很少有责任制定详细的方法论或设计临时工程,但永久工程工程师必须充分了解这些因素,以便为项目提供有效,整体的设计领导力,以最大限度地发挥其作用。为项目效率,工地安全和可持续性做出贡献,并履行其法定职责。

著录项

  • 来源
    《The Structural Engineer》 |2017年第7期|32-36|共5页
  • 作者

    Oamian McBride;

  • 作者单位

    Construction Engineering Manager (UK),Robert Bird Group;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:18:54

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号