...
首页> 外文期刊>Structural engineer >An introduction to refurbishment. Part 2: Maximising the opportunities at the design stage
【24h】

An introduction to refurbishment. Part 2: Maximising the opportunities at the design stage

机译:翻新的概论。 第2部分:最大化设计阶段的机会

获取原文
获取原文并翻译 | 示例
           

摘要

The two parts of this article provide a brief overview of the primary areas that are necessary to consider when dealing with existing buildings. Part 1 discussed ways in which engineers can identify potential opportunities for refurbishment at the early feasibility stage. Part 2 has considered ways to maximise these opportunities through design. In order to make best use of our existing building assets, engineers should be able to provide an informed response to the client, which includes thoroughly assessing the technical feasibility of reusing the building. This assessment can help reveal potential opportunities to add significant value, so the engineer can play a pivotal role in unlocking that value. Reusing an existing building is not the answer in every case, but carrying out an early assessment can reveal exciting potential opportunities that would otherwise be missed.
机译:本文的两部分介绍了在处理现有建筑物时所需的主要区域的简要概述。 第1部分讨论了工程师可以识别在早期可行性阶段翻新的潜在机会的方式。 第2部分已经考虑了通过设计最大化这些机会的方法。 为了充分利用我们现有的建筑资产,工程师应该能够向客户提供明智的回应,包括彻底评估重用建筑物的技术可行性。 此评估可以帮助揭示潜在的机会增加重大价值,因此工程师可以在解锁该价值中发挥关键作用。 在每种情况下重用现有建筑并不是答案,但进行早期评估可以揭示诸如将错过的令人兴奋的潜在机会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号