...
首页> 外文期刊>The Nuclear Engineer >Reducing Alarm Activity at Sizewell B Power Station
【24h】

Reducing Alarm Activity at Sizewell B Power Station

机译:减少Sizewell B电站的警报活动

获取原文
获取原文并翻译 | 示例
           

摘要

This paper discusses the Alarm Optimisation Project at Sizewell B PWR Power Station. It shows how a structured approach by a multi-disciplined team, coupled with innovative techniques in data analysis, has allowed considerable progress to be gained in the battle for control of alarm traffic. A number of specific examples show how benefit has been taken from a period of early operating experience and that use is being made of software modifications, plant modifications and changes to operating practices in order to engineer alarm reductions whilst still providing adequate alarm information to operating staff.
机译:本文讨论了Sizewell B PWR电站的警报优化项目。它显示了一个多学科团队的结构化方法,再加上数据分析中的创新技术,如何在控制警报流量的战斗中取得了长足的进步。大量的特定示例显示了如何从一段早期的操作经验中受益,并且正在使用软件修改,工厂修改以及对操作习惯的更改,以设计减少报警的方法,同时仍向操作人员提供足够的报警信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号