首页> 外文期刊>The engineers journal >CORRIB GAS TERMINAL SETS ENVIRONMENTAL MANAGEMENT STANDARD IN CONSTRUCTION
【24h】

CORRIB GAS TERMINAL SETS ENVIRONMENTAL MANAGEMENT STANDARD IN CONSTRUCTION

机译:施工中的CORRIB气体终端装置环境管理标准

获取原文
获取原文并翻译 | 示例
           

摘要

The Corrib gas field is located in the Slyne Trough, some 83km off the County Mayo coastline in 350m of water. The field contains high-purity natural gas with very small amounts of hydrocarbon liquids and water. It is being developed by Shell E&P Ireland Ltd. (SEPIL) and its partners Statoil Exploration Ireland Ltd. and Marathon International Petroleum Hibernia Limited as a long-range sub-sea tieback to the shore (i.e. sub-sea wells connected together and joined to shore by a sub-sea pipeline). The gas will be received and treated to meet sales gas specification in the onshore terminal at Bellanaboy Bridge. The purpose of the terminal is to process gas, treat the fluids received and control the operation of the gas field. The gas is processed at the terminal to meet the gas network transmission specification set by Bord Gais.
机译:Corrib气田位于Slyne槽中,距County Mayo海岸线约83公里,距水350m。该油田含有高纯度的天然气以及少量的烃类液体和水。它是由Shell E&P Ireland Ltd.(SEPIL)及其合作伙伴Statoil Exploration Ireland Ltd.和Marathon International Petroleum Hibernia Limited共同开发的,是将海上深海回注到岸上(即连接在一起并连接到由海底管道提供支撑)。天然气将在Bellanaboy桥的陆上码头接收和处理,以符合销售用气规范。终端的目的是处理气体,处理接收到的流体并控制气田的运行。气体在终端处进行处理,以满足Bord Gais设定的气体网络传输规范。

著录项

  • 来源
    《The engineers journal》 |2009年第4期|198-201|共4页
  • 作者

    Liam Dunne;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号