...
首页> 外文期刊>The engineers journal >ESBI project in Tanzania reaches major milestone
【24h】

ESBI project in Tanzania reaches major milestone

机译:坦桑尼亚的ESBI项目达到了重要的里程碑

获取原文
获取原文并翻译 | 示例

摘要

The US-Government funded Millennium Challenge Account Tanzania (MCA-T) has awarded a contract for the installation of a new 132kV submarine inter-connector from mainland Tanzania to Zanzibar Island and associated works to Japanese power cable company, Viscas Corporation. The installation of the cable and associated electric power line is part of an extensive energy project in Tanzania, funded by MCA-T, that ESB International (ESBI) has been working on since 2008 as consulting engineer and EPC construction supervisor.
机译:美国政府资助的坦桑尼亚“千年挑战帐户”(MCA-T)已获得一份合同,该合同将从坦桑尼亚大陆到桑给巴尔岛安装一个新的132kV海底互连器,并且与日本电力电缆公司Viscas Corporation进行相关工作。电缆和相关电力线的安装是由MCA-T资助的坦桑尼亚大型能源项目的一部分,ESB International(ESBI)自2008年以来一直以顾问工程师和EPC施工主管的身份从事该项目。

著录项

  • 来源
    《The engineers journal 》 |2010年第5期| P.142| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号