首页> 外文期刊>The engineers journal >New facility promises waste-toenergy advantages for north east
【24h】

New facility promises waste-toenergy advantages for north east

机译:新设施有望为东北带来废物转化为能源的优势

获取原文
获取原文并翻译 | 示例
           

摘要

The central function of the Indaver facility is to recover the energy value from residual municipal waste that remains after waste prevention, reuse and recycling. The Meath facility is designed to service primarily the north east waste management region (covering Meath, Louth, Monaghan and Cavan), which requires thermal treatment capacity as part of its integrated waste management plan. The facility will divert waste from landfill in line with the EU Landfill Directive. Early data returns from Ireland's first compliance year (2010) indicate that landfills are failing to ensure adequate pre-treatment of waste as required by the EPA in order to meet the Directive targets. This highlights a pressing need for pre-treatment capacity, to which the Meath facility will contribute an important amount. And, by diverting waste from landfill and generating renewable energy, the facility will reduce greenhouse gas emissions from the waste sector.
机译:Indaver设施的核心功能是从废物预防,再利用和回收后残留的城市残留物中回收能源价值。 Meath工厂的设计主要服务于东北废物管理地区(包括Meath,Louth,Monaghan和Cavan),该地区需要热处理能力作为其综合废物管理计划的一部分。该设施将按照欧盟《垃圾填埋指令》转移垃圾填埋场的废物。爱尔兰第一个合规年(2010年)的早期数据返回表明,垃圾填埋场无法确保按照EPA的要求对废物进行充分的预处理,以达到指令的目标。这突显了对预处理能力的紧迫需求,而Meath设施将为此做出重要贡献。而且,通过从垃圾填埋场转移废物并产生可再生能源,该设施将减少废物部门的温室气体排放。

著录项

  • 来源
    《The engineers journal》 |2011年第5期|p.312-314|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号