首页> 外文期刊>The Engineer >Crystal clear
【24h】

Crystal clear

机译:晶莹剔透

获取原文
获取原文并翻译 | 示例
           

摘要

The historic Crystal Palace transmission mast has been a landmark for lost travellers in the suburbs of southeast London for more than half a century. Towering over the boroughs of Croydon and Bromley, the huge 720ft lattice structure is considered by some to be one of Britain's major engineering feats. rnBut while many people view the structure as an rnunchanging cultural icon, behind the rnscenes engineers are making significant modifications to the steel mast in rnpreparation for the 2010 Digital Switch Over (DSO). The initiative is part of government plans to make Britain the world's 'digital capital' and will see transmission towers throughout the country overhauled in what is set to be the biggest and most complex re- engineering project in broadcast history.
机译:超过半个世纪以来,历史悠久的水晶宫传输桅杆一直是伦敦东南郊区迷失旅客的地标。高耸于Croydon和Bromley的行政区,巨大的720英尺格子结构被某些人视为英国的主要工程壮举之一。但是,尽管许多人认为该结构是一个不变的文化标志,但在场景设计背后,工程师正在为2010数字转换(DSO)的准备工作对钢桅杆进行重大修改。该计划是政府计划的一部分,该计划旨在使英国成为世界“数字首都”,并将在全国范围内对输电塔进行全面翻修,这将是广播历史上规模最大,最复杂的再工程项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号