首页> 外文期刊>The Engineer >in depth package deal
【24h】

in depth package deal

机译:深度包装交易

获取原文
获取原文并翻译 | 示例
           

摘要

The package of projects announced by Chancellor of the Exchequer George Osborne includes: ? Acceleration of building of the Tyne and Wear Metro; ? Electrification of Transpennine Express, cutting journey times between Manchester and Leeds by 45 minutes; ?Linking the M56 at Manchester Airport to the A6 south of Stockport; ?Major works on the A14 around Kettering to relieve congestion and in Cambridgeshire to improve junctions; ?Improvements to roads around the A45/46 interchange in the West Midlands;' ?Increasing capacity of the M3 in Surrey and the northern section of the M25.
机译:财政大臣乔治·奥斯本宣布了一系列的项目,其中包括:加快泰恩威尔大街的建设; ? Transpennine Express的电气化,将曼彻斯特和利兹之间的旅行时间缩短了45分钟;将曼彻斯特机场的M56与斯托克波特南部的A6相连;在凯特林(Kettering)附近的A14上进行了主要工作,以缓解交通拥堵,在剑桥郡(Cambridgeshire)改善了路口;西米德兰兹郡A45 / 46立交处周围道路的改善;在萨里和M25北部增加M3的容量。

著录项

  • 来源
    《The Engineer》 |2012年第7831期|p.23|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号