首页> 外文期刊>The Engineer >DRILLING FOR GEOTHERMAL HEAT
【24h】

DRILLING FOR GEOTHERMAL HEAT

机译:钻探地热热

获取原文
获取原文并翻译 | 示例
       

摘要

Planning permission has been granted for initial testing to take place on the Hebburn minewater scheme, which will draw geothermal energy from abandoned flooded mines in the former Hebburn Colliery to heat buildings including a residential tower block. Two wells will be drilled by Dunelm Geotechnical and Environmental Ltd to extract water from the mines, and tests will validate whether the scheme remains fully viable. Drilling works and construction of the wells are likely to take until the autumn to complete at the mine site, which was abandoned in 1932.
机译:初步测试批准了初步测试,以便在Hebburn Modewater计划中举行,这将从前鹤港煤矿的废弃洪水矿山绘制地热能,以热建筑物,包括住宅塔楼。 丹伊思岩岩岩石岩石和环境有限公司将钻出两头井,以从矿山中提取水,测试将验证该方案是否仍然完全可行。 钻井工程和井的建设可能会在秋天才能完成在1932年被遗弃的矿场。

著录项

  • 来源
    《The Engineer》 |2021年第7928期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号