...
首页> 外文期刊>Telecom A.M >LEVEL 3 ASKS COMMISSION TO CAP RIGHT-OF-WAY CHARGES
【24h】

LEVEL 3 ASKS COMMISSION TO CAP RIGHT-OF-WAY CHARGES

机译:第3级委员会要求收取通行费

获取原文
   

获取外文期刊封面封底 >>

       

摘要

The FCC should affirm that there's a limit on right-of-way fees, to promote broadband deployment, Level 3 said. In a petition last week, the company asked the FCC to preempt "unreasonable, unfair and discriminatory annual rents" required by the New York State Thruway Authority for Level 3 infrastructure. The rates, 180-725 times higher than prevailing charges, prevent the company from providing middle-mile broadband transport and other telecom services to small- and mid-sized communities along the Thruway, the company said. The authority's demands are "blatantly discriminatory," because others are charged annual rents according to scheduled rates consistent with prevailing rates, Level 3 said. "Although Level 3 is currently undertaking a nationwide project to expand its fiber networks to additional communities, NYSTA's rent demands and the difficulty of working with NYSTA on permitting prevent any such new fiber on-ramps from being economically sustainable, even with possible support under the recently enacted federal broadband stimulus program."
机译:Level 3说,FCC应该申明对通行费实行限制,以促进宽带部署。在上周的一份请愿书中,该公司要求FCC取消纽约州高速公路管理局对三级基础设施所要求的“不合理,不公平和歧视性的年租金”。该价格是现行收费的180-725倍,使该公司无法向Thruway沿线的中小型社区提供中英里宽带传输和其他电信服务。当局的要求是“公然歧视”,因为其他人要按照与现行利率一致的预定费率来收取年租金。 “尽管Level 3目前正在进行一项全国性项目,以将其光纤网络扩展到其他社区,但是NYSTA的租金要求以及与NYSTA合作的困难,即使有可能得到支持,这种新的光纤上坡道在经济上也无法持续发展。最近颁布了联邦宽带刺激计划。”

著录项

  • 来源
    《Telecom A.M》 |2009年第143期|P.1-1|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号