【24h】

Broadcast

机译:广播

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The FCC Media Bureau doesn’t plan to reveal the number of applications filed for new low-powernFM stations before the filing window closes Nov. 14, said staff from the Audio Division. The bureau willnnot disclose that number “so as not to disadvantage anybody who may be applying for spectrum in certainnareas” until after the close of the filing window, Jim Bradshaw, deputy chief of engineering, said Thursdaynduring a Q-and-A webinar. If there are thousands of applications, then the bureau will likely identify singletonnapplications within a couple of months, he said. Many decisions could be issued the first fewnmonths of 2014, he said. Applicants can file minor amendments, but major amendments, like changingnthe channel position plus or minus three, must wait until after the mutually exclusive public notice is released,nBradshaw said. A university with a full-power license can apply for an LPFM license if the fullpowernstation isn’t run by students, said Parul Desai, an attorney in the division. The new station must benstudent-run, but it will not qualify for a new entrant point, she added. The Form 318 application, call signnand license will be granted in three different steps, said Gary Loehrs, an engineering staff member. Anboard member with a past felony isn’t an automatic disqualifier for an application, but it must be disclosed, Desai said. The commission will not allow a letter from parties within an interference area to indicatenwillingness to accept interference, Bradshaw said. If there’s any kind of structure in interference areas,nthe division will assume it’s occupied as a residence or workplace, he said. Desai also reminded applicantsnthat reasonable assurance is needed only for the antenna location and not the main studio location.nThe webinar was postponed from Oct. 3 due to the 16-day government shutdown (CD Oct 22 p2). It willnbe archived at http://www.fcc.gov/events.
机译:音频部门的工作人员说,FCC媒体局不打算在11月14日关闭申请窗口之前透露新的低功率FM电台的申请数量。工程局副局长吉姆·布拉德肖(Jim Bradshaw)星期四在一次问答网络研讨会上表示,该局将不会透露这一数字,“以免不利于可能在某些国家申请频谱的任何人”。他说,如果有成千上万的申请,那么该局很可能会在几个月内确定单件申请。他说,许多决定可能会在2014年前几个月发布。布拉德肖说,申请人可以提出较小的修改,但是主要的修改(例如更改频道位置的正负三个)必须等到相互排斥的公告发布后再进行。该部门的律师帕鲁·德赛(Parul Desai)表示,如果全功率工作站不是由学生管理的,则拥有全功率许可证的大学可以申请LPFM许可证。她补充说,新的车站必须是学生经营的,但不符合新进入点的资格。工程人员Gary Loehrs说,将通过三个不同的步骤来授予318表申请,呼叫签署和许可。德赛说,过去有重罪的成员不是自动取消申请资格,但必须予以披露。布拉德肖说,该委员会将不允许干扰地区内各方的来信表明愿意接受干扰。他说,如果干扰区有任何结构,该部门将不会将其视为住宅或工作场所。 Desai还提醒申请者n仅在天线位置而不是在主工作室位置才需要合理保证。n由于政府关闭了16天(CD 10月22日p2),网络研讨会从10月3日推迟了。它将不会存档在http://www.fcc.gov/events。

著录项

  • 来源
    《Telecom A.M.》 |2013年第207期|17-18|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号