首页> 外文期刊>Sun & Wind Energy >CSP plant Hualapai Valley receives environmental certification
【24h】

CSP plant Hualapai Valley receives environmental certification

机译:华拉派谷CSP工厂获得环保认证

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The Arizona Corporate Commis-sion (ACC) approved the 340 MW Hualapai Valley Solar CSP project's Certificate of Environmental Compatibility (CEC). The CEC was the last approval for the project developer Mohave Sun to begin construction of the power plant. Beside the plant itself, the CEC approves intercon-nection and transmission plans. The Hualapai Valley plant got the approval to use wastewater tor an evaporative cooling system. The ACC expressed that Hualapai is likely to be the last project that gets ap-proval to use water cooling.
机译:亚利桑那州企业委员会(ACC)批准了340兆瓦华拉派谷太阳能CSP项目的环境兼容性证书(CEC)。 CEC是项目开发商Mohave Sun开始建造电厂的最后批准。除了工厂本身,CEC还批准了互连和传输计划。 Hualapai Valley工厂获得了将废水用于蒸发冷却系统的批准。行政协调会表示,华拉派很可能是最后一项获得批准使用水冷却的项目。

著录项

  • 来源
    《Sun & Wind Energy》 |2010年第12期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号