...
首页> 外文期刊>Structural Survey >Barriers to BIM implementation and ways forward to improve its adoption in the Nigerian AEC firms
【24h】

Barriers to BIM implementation and ways forward to improve its adoption in the Nigerian AEC firms

机译:BIM实施的障碍和向前推进在尼日利亚AEC公司采用的方式

获取原文
获取原文并翻译 | 示例

摘要

Purpose - BIM has much potential to improve the effectiveness of construction works with respect to design, construction and maintenance. However, many Architecture, Engineering, and Construction (AEC) firms are still lagging in the adoption and implementation of BIM in both developing and developed countries. The purpose of this study is to assess the barriers to BIM implementation, and examine the ways forward to improve BIM adoption within the Nigerian AEC firms. Design/methodology/approach - A comprehensive literature review and questionnaire survey were used in the study. The survey targeted four different AEC firms. These include architectural firms, facility management firms, quantity surveying firms and structural engineering firms in Lagos, Nigeria. The data obtained were analyzed using mean score, standard deviation, Kruskal-Wallis test, and factor analysis. Findings - The study identified 20 barriers to BIM implementation and identified ten ways forward to improve BIM adoption in AEC firms, particularly in Nigeria. The relative importance of both the identified barriers and the ways forward were gauged. The Kruskal-Wallis tests revealed that except for one (out of 20) identified barriers, and one (out of 10) identified ways forward; there is no statistical significant difference in the perceptions of four different AEC firms. The factor analysis result grouped the 20 identified barriers into three major factors to include: weak top management support and BIM environment related issues; cost of BIM software and training issues; and incompatibility, legal, contractual, and culture related issues. Practical implications - The significance of the study cannot be over-emphasized due to BIM relevance to construction stakeholders and researchers at large. Originality/value - The study findings would inform the decisions of the construction stakeholders to make some policy recommendations capable of positively influencing the full BIM implementation in AEC firms.
机译:目的 - BIM有可能提高建筑工程的有效性,设计,建造和维护。然而,许多建筑,工程和建筑(AEC)公司仍然滞后于在发展中国家和发达国家的BIM的采用和实施中滞后。本研究的目的是评估BIM实施的障碍,并检查前进的方式,以改善尼日利亚AEC公司内的BIM采用。设计/方法/方法 - 研究中的全面的文献综述和调查问卷调查。该调查针对四家不同的AEC公司。其中包括亚洲尼日利亚拉各斯的架构公司,设施管理公司,数量测量公司和结构工程公司。使用平均分数,标准偏差,kruskal-wallis测试和因子分析来分析所获得的数据。调查结果 - 该研究确定了BIM实施的20个障碍,并确定了10种方式,以改善AEC公司的BIM采用,特别是在尼日利亚。所识别的障碍和向前方式的相对重要性被衡量。 Kruskal-Wallis测试显示,除​​了一个(20个)鉴定的障碍之外,还有一个(10个)确定的方式前进;四个不同AEC公司的看法没有统计学意义。因子分析结果将20个识别的障碍分为三个主要因素,包括:薄弱的顶级管理支持和BIM环境相关问题; BIM软件和培训问题的成本;和不相容,法律,合同和文化相关问题。实际意义 - 由于与建筑利益相关者和大型研究人员的关系,不能过度强调研究的重要性。原创性/价值 - 研究调查结果将告知建设利益攸关方的决定,以使能够积极影响AEC公司的全面BIM实施的一项政策建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号