首页> 外文期刊>Structural Survey >Roles and functions of stakeholders in implementing energy retrofits in the hotel sector
【24h】

Roles and functions of stakeholders in implementing energy retrofits in the hotel sector

机译:利益相关者在酒店部门实施能源改造方面的角色和职能

获取原文
获取原文并翻译 | 示例
       

摘要

Purpose - The success of energy retrofits (ER) projects is highly dependent on the involvement of right stakeholders at the right stage. So far, little insight is available from previous literature on the involvement of different stakeholders during various stages of the ER decision-making process, and their roles and functions in the respective stages. This is specifically true in the context of Energy Service Company (ESCO) led ER projects, which is an emerging trend in the current context. Hence, this paper aims to investigate the roles and functions of stakeholders during different stages of an ESCO-led ER project in the hotel sector. Design/methodology/approach - An in-depth case study was conducted in a selected hotel building to gain insights into the roles and functions of stakeholders throughout the project stages. To collect the required data, face-to-face semi-structured interviews were conducted with seven selected respondents within the case. Findings - The study identified nine key stakeholders that were involved during five different project stages along with their functions. Based on these identified functions, four main roles (i.e. decision-maker, performer, monitor/observer, and supporter) emerged that were reflective of the nature of the stakeholders' involvement in different stages of the decision-making process. Owner/client, facilities manager (FM), ESCO and architect attached to ESCO emerged as the key "decision-makers" during project implementation process. Originality/value - The outcomes of this research would be useful in ensuring the proactive involvement of all the identified stakeholders in respective project stages of ESCO led ER projects in the hotel sector.
机译:目的 - 能源改造(ER)项目的成功高度依赖于右阶段的权利利益攸关方的参与。到目前为止,在ER决策过程的各个阶段的各个阶段,以及各个阶段的角色和作用,可以从以前的文献中获取几乎没有洞察力。在能源服务公司(ESCO)LED ER项目的背景下,这是特殊的真实,这是当前背景的新兴趋势。因此,本文旨在调查利益攸关方在酒店部门的Esco-Led ER项目的不同阶段的作用和职能。设计/方法/方法 - 在选定的酒店建筑中进行了深入的案例研究,以了解整个项目阶段的利益相关者的角色和功能。要收集所需数据,面对面的半结构化访谈是在案件中的七个选定的受访者进行的。调查结果 - 该研究确定了九个不同项目阶段参与的九个关键利益相关者以及其职能。基于这些确定的职能,出现了四个主要角色(即决策者,表演者,监视器/观察员和支持者),这是反映了决策过程的不同阶段的利益相关者参与的性质。所有者/客户,设施经理(FM),ESCO和建筑师在项目实施过程中作为关键“决策者”出现在ESCO中。原创性/价值 - 本研究的结果对于确保所有已确定的利益攸关方在酒店部门的ESCO LED ER项目的各个项目阶段积极参与。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号