...
首页> 外文期刊>Bautechnik >Extension of Wismar port - a complex and demanding port construction project
【24h】

Extension of Wismar port - a complex and demanding port construction project

机译:维斯马港扩建-一个复杂而苛刻的港口建设项目

获取原文
获取原文并翻译 | 示例
           

摘要

Wismar Port's extension, with berthing places for bulk carriers, will be approximately as big as six soccer pitches, and includes the largest current quay wall construction project on Germany's Baltic Sea coast. Inros Lackner, in its role as general consultant, is specialised in the planning and design of complex and multidisciplinary projects. The multifaceted demands of this port extension project incorporate all aspects of modern port construction - sheet piling, dredging and disposal, soil stabilisation and consolidation, concrete construction and construction of railway tracks and pavement construction. The port - extension is expected to be completed in 2018.
机译:维斯马港的扩建部分将有散货船停泊的地方,面积将多达六个足球场,其中包括德国波罗的海沿岸目前最大的码头墙建设项目。 Inros Lackner担任总顾问,专门从事复杂和多学科项目的规划和设计。港口扩建项目的多方面要求包括现代港口建设的各个方面-板桩,疏dr和处置,土壤稳定和固结,混凝土建设以及铁路轨道和路面建设。港口扩建预计将于2018年完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号