Abwasserkanal Emscher - Pumpwerk Oberhausen Besondere Herausforderungen auf der Zielgeraden zur Abwasserfreiheit

机译:污水渠Emscher-奥伯豪森泵站住宅面临的特殊挑战:无污水

获取原文
获取原文并翻译 | 示例
           

摘要

Three large sewage pumping stations are being built by the Emschergenossenschaft as part of the Emscher conversion project. Construction work on the largest pumping station in Oberhausen began at the beginning of 2016; completion is scheduled for the end of 2020. In the future the Oberhausen pumping station will pump the incoming wastewater volume of max. 15.3 m(3)/s from a depth of approx. 40 m, the annual pumping volume will be around 160 million m(3). On the way to its completion, the pumping station poses a number of challenges for all people who are involved in the project. In addition to a technically very demanding structure, the tight time schedule must also be taken into account in order to be able to guarantee the goal of an effluent free Emscher river in 2021. The pumping station also serves the Emschergenossenschaft as a pilot project for the application of BIM.
机译:Emschergenossenschaft正在建造三个大型污水泵站,作为Emscher转换项目的一部分。奥伯豪森最大的泵站的建设工作于2016年初开始;计划于2020年底完成。未来,奥伯豪森抽水站将抽入最大废水量。大约15.3 m(3)/ s 40 m,年抽水量约为1.6亿m(3)。在完成工程的过程中,泵站对参与该项目的所有人构成了许多挑战。除了技术上非常苛刻的结构外,还必须考虑时间紧迫的时间表,以确保实现2021年免费的Emscher河流出水的目标。泵站还为Emschergenossenschaft提供服务,作为该项目的试点项目。 BIM的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号