首页> 外文期刊>Bautechnik >BIM-Modelle und die Bearbeitung durch Prüfingenieure
【24h】

BIM-Modelle und die Bearbeitung durch Prüfingenieure

机译:BIM模型和测试工程师的处理

获取原文
获取原文并翻译 | 示例
       

摘要

The following essay presents possibilities to use model data of a structural static. Previous experiences show that you can use the same processes in test operations, as well as in setting up a static calculation. In this case, it is advantageous that the building models are already included as data form in a BIM process. The data to describe the geometry and component information can be further processed with the usual software program. But boundary conditions are often not properly recorded or described. This leads to incoherent calculations, which require extra effort for further processing. Verification of deformations is usually limited to the indication of elastic deformations. The transition to state II, nonlinear behavior and creep & shrinkage, are often neglected. The deflection is restricted to the limit to L/250. Limiting the angular displacement would be a much more sensitive criterion for limiting deformations. In geotechnology examination the angular rotation is a frequently used parameter to prevent structural damage.
机译:以下文章提出了使用结构静态模型数据的可能性。以前的经验表明,您可以在测试操作以及设置静态计算中使用相同的过程。在这种情况下,将建筑模型作为数据形式包含在BIM过程中是有利的。可以使用常规软件程序进一步处理描述几何形状和组件信息的数据。但是边界条件通常没有正确记录或描述。这导致计算不连贯,需要额外的精力进行进一步处理。变形的验证通常仅限于弹性变形的指示。到状态II的过渡,非线性行为以及蠕变和收缩通常被忽略。挠度限制为L / 250。限制角位移将是限制变形的更为敏感的标准。在地质技术检查中,角旋转是防止结构损坏的常用参数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号