The design and construction of the Irlahuell-tunnel was a great challenge for the contractor as the changing geological conditions required a continuous adaptation of the tunnelling method in order to ensure safe working conditions and to deliver a state-of-the-art tunnel. Experience gained during this project has showed that clear lines of communication between client and contractor, i.e. the decision-making partners, are of crucial importance for the success of such a demanding project. Furthermore, a close collaboration of the designer and the independent checking engineer with respect to defining and classifying possible karst cavities before they were encountered was also a key to the successful delivery of this project.
机译:Irlahuell隧道的设计和施工对承包商来说是一个巨大的挑战,因为不断变化的地质条件要求不断采用隧道方法,以确保安全的工作条件并交付最先进的隧道。在该项目中获得的经验表明,客户与承包商(即决策伙伴)之间的清晰沟通对这一要求苛刻的项目的成功至关重要。此外,设计人员和独立检查工程师在确定可能出现的岩溶腔之前就它们进行定义和分类的密切合作,也是成功交付该项目的关键。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号