Major regeneration and redevelopment in Stratford is being under-taken in preparation for London 2012 Olympic and Paralympic Games. The Olympic Delivery Authority (ODA), working with its Delivery Partner CLM, is responsible for building the new venues and infrastructure needed for the 2012 Games and beyond. The London Organising Committee of the Olympic Games and Paralympic Games (LOCOG) is responsible for promoting and staging the 2012 Games. The Northern Outfall Sewer (NOS) emerges from below the ground to the west of the Park and cuts through the southern part of the Olympic Park as an elevated embankment. A new underpass is being constructed under the NOS in order to provide spectator access during the Games and improved headroom road access in the long term. The existing disused Marshgate Lane is to be lowered by 3 m in order to provide sufficient highway headroom. In addition to the design and construction of new works for the underpass, this project has involved assessment of cast iron suspended sewers and wrought iron bridge girders, including live structural monitoring and load testing to confirm the effect of construction on the existing structure. Permeation grouting is being used to underpin the existing bridge foundations, and a full-scale permeation grout trial was carried out to confirm the efficiency of the proposal prior to starting the main works. The structure is currently under construction and is scheduled for completion in 2011.
机译:为了准备2012年伦敦奥运会和残奥会,斯特拉特福德正在进行大规模的再生和再开发。奥林匹克交付管理局(ODA)与其交付合作伙伴CLM合作,负责建设2012年奥运会及以后所需的新场馆和基础设施。伦敦奥运会和残奥会组织委员会(LOCOG)负责宣传和举办2012年奥运会。北部下水道(NOS)从地下出现到公园的西部,穿过奥林匹克公园的南部,成为高架路堤。为了在奥运会期间为观众提供通道,并在长期内改善了净空道路通道,正在NOS下修建新的地下通道。现有废弃的马什盖特巷将降低3 m,以提供足够的高速公路净空。除了设计和建造地下通道的新工程外,该项目还涉及对铸铁悬挂式下水道和锻铁桥梁大梁的评估,包括现场结构监测和载荷测试,以确认施工对现有结构的影响。渗透灌浆被用来支撑现有的桥梁基础,并在开始主要工程之前进行了一次全面的渗透灌浆试验,以确认该建议的有效性。该结构目前正在建设中,计划于2011年完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号