The New Old Bridge: Renovation of the Macdonald Suspension Bridge

机译:新旧桥:麦克唐纳吊桥的翻新

获取原文
获取原文并翻译 | 示例
           

摘要

The Angus L. Macdonald Bridge crosses Halifax Harbour in Nova Scotia. The existing deck is being replaced because it has reached the end of its service life. The design of the new superstructure and its replacement sequence were completed in 2013. The contractor is now replacing the entire suspended structure and hangers sequentially during night and weekend closures while the bridge is kept open for daytime traffic. The effects of the erection sequence on bridge behaviour are supported by sophisticated automated erection analysis models which account for the geometry of the existing bridge, positioning of the erection equipment on the deck and necessary hanger and strand jack adjustments that are required during construction to prevent overloading of the structure. The design involved significant wind tunnel testing and analysis to ensure aerodynamic stability during erection and in the final condition.
机译:安格斯·麦克唐纳大桥横跨新斯科舍省的哈利法克斯港。现有甲板已被替换,因为它已经达到使用寿命。新的上层建筑的设计及其更换顺序已于2013年完成。承包商现在在晚上和周末关闭期间依次更换整个悬吊结构和吊架,同时桥梁仍为白天通行。复杂的自动安装分析模型可支持安装顺序对桥梁性能的影响,该模型考虑了现有桥梁的几何形状,安装设备在甲板上的位置以及在施工期间为防止超载而需要进行的必要的吊架和绞车千斤顶调节结构。该设计涉及大量的风洞测试和分析,以确保在安装过程中和最终状态下的空气动力学稳定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号