Post-installed reinforcement connections at ultimate and serviceability limit states

机译:后装钢筋连接处于极限和可维修性极限状态

获取原文
获取原文并翻译 | 示例
           

摘要

When reinforcing bars are post-installed in holes drilled in cured concrete, adhesive mortars are used to create a bond between concrete and bars. Appropriate adhesives can develop higher bond strengths than standard ribbed bars cast into concrete. A detailed design concept for the anchorage length of reinforcing bars has been developed by taking into account splitting/spalling of the concrete and pullout. Pullout and splitting tests on reinforcing bars set in concrete were carried out with different adhesive mortars and with varying concrete strengths and concrete covers. When higher bond strengths than those recommended for cast-in reinforcement are taken into account, it is important to check deformations and crack widths at the serviceability limit state (SLS) separately. For this reason, structural tests on slabs and corbels were carried out. Moreover, pullout tests on post-installed reinforcing bars were performed in order to measure displacements at service load level.
机译:将钢筋后期安装到在固化混凝土中钻出的孔中时,可使用胶砂浆在混凝土和钢筋之间建立粘结。合适的胶粘剂可以比铸入混凝土中的标准肋筋具有更高的粘结强度。考虑到混凝土的劈裂/剥落和拔出,已经开发出了钢筋锚固长度的详细设计概念。用不同的粘结砂浆,不同的混凝土强度和混凝土覆盖层对设置在混凝土中的钢筋进行拉拔和劈裂试验。当考虑到比推荐用于铸造增强的粘结强度更高的粘结强度时,重要的是要单独检查在使用极限状态(SLS)下的变形和裂缝宽度。因此,对平板和牛腿进行了结构测试。此外,在安装后的钢筋上进行了拉拔测试,以测量在使用载荷水平下的位移。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号